Infrastructure
Renovation and Maintenance of Årsta Bridge

Client: Trafikverket
Assignment: Repair/Strengthening using injection concrete.
Built in the late 1920s the bridge serves as a vital link between the south of Stockholm and the outer lying suburbs. The project is a necessary renovation and maintenance work after almost 90 years of operation in order to keep the bridge in service for another 50 years, at least.
2008-

Steel Bridge Construction

Client: City of Stockholm Transport Authority.
Assignment: Structural Design and Construction.
Construction of a new steel bridge within the city limits of Stockholm.
2009-2010
Maintenance of Stockholm City Ports

Client: Ports of Stockholm
Assignment: Project Management.
Undertake direction, planning and management for the maintenance project of Stockholm's City Ports.
2007-

Stockholm Metro Infrastructure Project

Client: Stockholms Local Transportation Authority
Assignment: Inspection and Assessment.
Project undertakes an annual inspection and examination of all bridges, structures and overhead lines within Stockholm’s underground metro (train) system.
2007-2010

Stockholms City Bus Maintenance Station

Client: Stockholms Local Transportation Authority
Assignment: Design & Architecture.
A maintenance station where Stockholm’s city buses are washed and maintained especially during the harsh winter season required general consulting work for the design architecture of a new station in Stockholm area of Sweden.
2009

